This is a list of all public deliverables (Draft waiting for formal approval by the Commission)

WP1 | Preparation and planning of the pilot
D.1.1 – Use cases description and Privacy Threat Vulnerability and Risk Analysis – (update 1)
An updated version of the previous release of the deliverable.
D.1.2 – Regulatory constraints (update 1)
An updated version of the previous release of the deliverable.
D.1.3 – Pilot scope description and system requirements (update 2)
An updated version of the previous release of the deliverable.
D.1.4 – System Architecture (update 1)
An updated version of the previous release of the deliverable.
D.1.4 – System Architecture Appendix-1
D.1.4 – System Architecture Appendix-2

 

WP2 | Pilot data harmonisation and deployment of indoor/outdoor virtual hub (geoportal)
D.2.1 – Data Survey Report (update 2)
An updated version of the previous release of the deliverable.
D.2.2 – Analysis of open data repositories (update 1)
An updated version of the previous release of the deliverable.
D.2.3 – Geospatial database with pilot-relevant data and open data connectors (update 1)
An updated version of the previous release of the deliverable.
D.2.4 – Geometrical and Topological Model Checker (Accompanying report)
The prototype of the Geometrical and Topological Model Checker, extended to allow user-friendly customisation of rules (geometrical and topological) and integrated with the service infrastructure.
D.2.4 – Geometrical and Topological Model Checker (Prototype)
Online
The source code of the software prototype is available for download from the “development” section of the project website.
D.2.5 – Geoprocessing infrastructure (Accompanying report) (update 1)
An updated version of the previous release of the deliverable.
D.2.6 – Geospatial database with other portal data (Accompanying report) (update 1)
An updated version of the previous release of the deliverable.
D.2.7 – The i-locate “virtual hub” (Accompanying report) (update 1)
An updated version of the previous release of the deliverable.
D.2.8 – Mobile client and portal infrastructure documentation manuals (Accompanying report) (update 1)
An updated version of the previous release of the deliverable.

 

WP3 | i-locate toolkit integration
D.3.1 – i-locate Toolkit v1.0 (Accompanying report) (update 1)
An updated version of the previous release of the deliverable.
D.3.1 – i-locate Toolkit v1.0 (Prototype)
Online
The source code of the software prototype is available for download from the “development” section of the project website.
D.3.2 – Localisation and Tracking System (Accompanying report)
The source code of the software prototype is available for download from the “development” section of the project website.
D.3.2 – Localisation and Tracking System (Prototype)
Online
The source code of the software prototype is available for download from the “development” section of the project website.
D.3.3 – Routing Service
This deliverable reports the development of the routing system for indoor and outdoor navigation.
D.3.4 – Asset Management
This report illustrates the Asset Management service module developed in the context of i-locate.
D.3.5 – Security and privacy layer
This deliverable describes the functions of the security layer and privacy protection layer of the i-locate architecture.
D.3.6 – i-locate clients – final version
This deliverable includes the description of the i-locate clients for usage within the pilot sites.
D.3.7 – i-locate toolkit v.2.0
This deliverable describes the artefacts shipped with v.2.0 of the toolkit.
D.3.8 – i-locate manuals (update 1)
An updated version of the previous release of the deliverable.
D.3.9 – i-locate toolkit V3.0
This deliverable describes the artefacts composing v.3.0 of the i-locate toolkit, the final version that benefits from the experimental activities carried out in the pilot sites.

 

WP4 | Pilot deployment and training
D.4.1 – Pilots deployment and validation plan (upload 1)
An updated version of the previous release of the deliverable.
D.4.2 – Technical evaluation of first version of i-Locate toolkit
A report detailing an evaluation of the i-Locate Toolkit version 1.0.
D.4.3 – Technical evaluation of second version of i-Locate toolkit
A report detailing an evaluation of the i-Locate Toolkit version 2.0.
D.4.4 – i-locate training framework
A report describing and linking to the training framework platform.

 

WP5 | Pilot operational phase
D.5.1 – First pilot progress report This report illustrates the progress of the various pilot sites.
D.5.2 – Second pilot progress report This second of three progress report illustrates the progress of the various pilot sites.
D.5.3 – Third pilot progress report This last progress report illustrates the progress of the various pilot sites.
D.5.4 – Mid-term pilots evaluations, assessment and recommendations for improvements This document provides a snapshot for each single pilot’s status and for the project as a whole, after few months of operation, and will serve as a tool for improvement by providing feedback to pilots’ teams.
D.5.5 – Final pilots evaluations This document provides a snapshot for each single pilot’s status and for the project as a whole, close to the end of operations. The document should be regarded as a tool to measure improvements in respect to the baseline defined and documented in the deliverable D5.4.
D.5.6 – Technical and economical evaluations This document provides some business insights on the indoor technologies trialled in the i-locate project by analysing the technology trends, the lessons learned, and the market potential prospects.

 

WP6 | Project awareness and long-term sustainability
D.6.1 – Fact Sheet
The Fact Sheet outlines the project’s rationale and objectives, specify its technical baseline and intended target groups and application domains, and detail intermediate and final outputs.
D.6.2 – First version of the website and web 2.0 channels (update 1)
An updated version of the previous release of the deliverable.
D.6.3 – Final version of the website and web 2.0 channels
The final version of the website and web 2.0 channels.
D.6.4 – First project media pack (Accompanying report)
A comprehensive set of dissemination elements including: logo, banner, flyer, brochure, poster, official short description
D.6.4 – First project media pack (Other)
The link to the page from which the various components of the media pack can be downloaded
D.6.5 – First dissemination and exploitation plan (update 1)
An updated version of the previous release of the deliverable.
D.6.6 – Second project media pack (Accompanying report) A comprehensive set of dissemination elements including: logo, banner, flyer, brochure, poster, official short description.
D.6.6 – Second project media pack (Other)
The link to the page from which the various components of the media pack can be downloaded
D.6.7 Second dissemination and exploitation plan (update 1)
An updated version of the previous release of the deliverable.
D.6.8 – Third project media pack (Accompanying report)
A comprehensive set of dissemination elements including: logo, banner, flyer, brochure, poster, official short description.
D.6.8 – Third project media pack (Other)
The link to the page from which the various components of the media pack can be downloaded
D.6.9 Third dissemination and exploitation plan
An overview of the dissemination and exploitation plan.
D.6.10 – Licensing policies and SLA
The license model identified for the various products and the Service Level Agreement for the i-locate middleware.
D.6.11 – IPR Toolkit for i-locate
Confidential
D.6.12 – i-locate long-term exploitation plan
Confidential
D.6.13 – Contributions to standardisation
The present document describes the actions of project i-locate in advancing standardisation of functions that support i-locate and similar projects.

 

WP7 | Project management
D.7.1 – Project Charter (version 2)
An updated version of the previous release of the deliverable.
D.7.2 – Risk log
A brief updated risk log highlighting ongoing risks, probability, and impact.
D.7.3 – Risk log
A brief updated second version risk log highlighting ongoing risks, probability, and impact.
D.7.4 – Risk log
A brief updated third version risk log highlighting ongoing risks, probability, and impact.